CURRENT STATUS: no activity in progress

Scheduled Maintenance Activities

Date Time Infrastructure Site/Room Description Impact Status
  • Wed, Oct 16th 2024, from 9.00 AM to 11.59 PM CEST
  • Thu, Oct 17th 2024, from 12.00 Midnight to 11.59 PM CEST
  • Fri, Oct 18th 2024, from 12.00 Midnight to 5.00 PM CEST
Datacenter ROM1 (Caesar) Maintenance on cooling systems This maintenance activity will have no impact on the systems but it will lead to a slight rise in temperatures. No service downtime is expected. PENDING
Sat, Jun 29th 2024 9.00 AM to 4.00 PM CEST Datacenter NEA1 Namex Napoli Inspections and maintenance of the electrical infrastructure by the supplier, E-distribuzione. Power will be provided by the uninterruptible power system and the power generator. However, due to the long duration of the maintenance, power supply interruptions may still occur. COMPLETED
Tue, May 28th 2024 8.00 AM to 12.00 PM CEST DCI Systems ROM3 (Tiberius) Ring protection mechanisms and procedures will be tested Brief disruptions to peering LAN connectivity and Route Servers are expected COMPLETED
Wed, May 15th 2024 9.00 AM to 02.00 PM CEST DCI Systems ROM3 (Tiberius) New 400G WDM DCI system will be deployed, customers will be migrated to IP fabric leaf Brief disruptions to peering LAN connectivity and Route Servers are expected COMPLETED
Wed, May 15th 2024 8.30 AM to 02.00 PM CEST Datacenter ROM1 (Caesar/CINECA), all rooms Maintenance on power distribution systems Planned activities will involve transformers, UPS, and main switches. Power will be granted by generators, no service disruption is expected COMPLETED
Tue, Mar 5th 2024 10.00 AM to 01.00 PM CET Peering Platform BRI1 (Namex Bari) The planned activities will involve power distribution systems on nodes in the peering platform Connectivity on the peering platform may be partially disrupted and route servers might be temporarily unavailable as well during operations COMPLETED
Tue, Feb 13th 2024 9.00 AM to 02.00 PM CET Datacenter BRI1 (Namex Bari) The planned activities will involve power distribution systems, power supply will be granted by continuity systems and generators No service downtime is expected COMPLETED
Wed, Sep 6th 2023 12.00 PM (Noon) to 6.00 PM CEST Datacenter BRI1 (Namex Bari) The planned activities will involve power distribution systems, power supply will be granted by continuity systems and generators No service downtime is expected COMPLETED
Tue, Aug 1st 2023 4.00 AM to 7.00 AM CEST Peering Platform ROM (Namex Roma) Software upgrade of NVIDIA/Cumulus platform nodes, Route Server address renumbering to /23 Connectivity on the peering platform will be partially disrupted according to nodes being currently upgraded, route servers might be temporarily unavailable as well during operations. COMPLETED
Thu, Jul 6th 2023 8.00 AM to 5.00 PM CEST Datacenter ROM1 (Caesar/CINECA), all rooms Maintenance on power distribution systems Interruptions in the supply of electricity to all the single-powered devices connected to A-line. Therefore, we suggest that you make accurate checks on your equipment and possibly take the right countermeasures. No service downtime is expected on dual-powered devices (connected to both A and B power lines) COMPLETED
Thu, Jul 5th 2023 2.00 PM to 5.00 PM CEST Datacenter ROM1 (Caesar/CINECA), all rooms Maintenance on power distribution systems The planned activities will involve transformers, UPS, and main switches. Power will be granted by generators, no service disruption is expected COMPLETED