July 15-16th 2025 |
9.00 AM to 1.00 PM CEST |
Datacenter |
ROM1/Caesar, all rooms |
Preparatory works for the replacement of medium-voltage circuit breakers. Branch A will be worked on July 15th, branch B on July 16th. |
During each of the above windows, power to the affected branch will be temporarily switched to generator supply. No service disruption is expected, and power continuity will be maintained at all times. |
PENDING |
Thu, May 22nd 2025 |
8.00 AM to 2.00 PM CEST |
Datacenter |
BRI1/Namex Bari |
Planned maintenance on power distribution systems |
The planned activities will involve UPS, and main switches. Power will be granted by generator, no service disruption is expected. |
COMPLETED |
Mon, May 19th 2025 |
8.00 AM to 2.00 PM CEST |
Datacenter |
ROM1/Caesar, all rooms |
Planned maintenance on power distribution systems |
The planned activities will involve transformers, UPS, and main switches. Power will be granted by generator, no service disruption is expected. |
CANCELED |
Wed, Feb 26th 2025 |
8.00 AM to 12.00 PM CET |
Peering Platform |
BRI1 Namex Bari |
Upgrade of peering infrastructure |
The activity will cause an interruption of the Peering service and unavailability of the Route Server service during the specified time frame |
COMPLETED |
Tue, Oct 29th 2024 |
9.00 AM to 2.00 PM CET |
Datacenter |
BRI1 Namex Bari |
Maintenance on power distribution systems |
Power will be granted by continuity system and power generator. No service downtime is expected |
COMPLETED |
- Wed, Oct 16th 2024, from 9.00 AM to 11.59 PM CEST
- Thu, Oct 17th 2024, from 12.00 Midnight to 11.59 PM CEST
- Fri, Oct 18th 2024, from 12.00 Midnight to 5.00 PM CEST
|
Datacenter |
ROM1 (Caesar) |
Maintenance on cooling systems |
This maintenance activity will have no impact on the systems but it will lead to a slight rise in temperatures.
No service downtime is expected. |
COMPLETED |
Sat, Jun 29th 2024 |
9.00 AM to 4.00 PM CEST |
Datacenter |
NEA1 Namex Napoli |
Inspections and maintenance of the electrical infrastructure by the supplier, E-distribuzione. |
Power will be provided by the uninterruptible power system and the power generator. However, due to the long duration of the maintenance, power supply interruptions may still occur. |
COMPLETED |
Tue, May 28th 2024 |
8.00 AM to 12.00 PM CEST |
DCI Systems |
ROM3 (Tiberius) |
Ring protection mechanisms and procedures will be tested |
Brief disruptions to peering LAN connectivity and Route Servers are expected |
COMPLETED |
Wed, May 15th 2024 |
9.00 AM to 02.00 PM CEST |
DCI Systems |
ROM3 (Tiberius) |
New 400G WDM DCI system will be deployed, customers will be migrated to IP fabric leaf |
Brief disruptions to peering LAN connectivity and Route Servers are expected |
COMPLETED |
Wed, May 15th 2024 |
8.30 AM to 02.00 PM CEST |
Datacenter |
ROM1 (Caesar/CINECA), all rooms |
Maintenance on power distribution systems |
Planned activities will involve transformers, UPS, and main switches.
Power will be granted by generators, no service disruption is expected |
COMPLETED |
Tue, Mar 5th 2024 |
10.00 AM to 01.00 PM CET |
Peering Platform |
BRI1 (Namex Bari) |
The planned activities will involve power distribution systems on nodes in the peering platform |
Connectivity on the peering platform may be partially disrupted and route servers might be temporarily unavailable as well during operations |
COMPLETED |
Tue, Feb 13th 2024 |
9.00 AM to 02.00 PM CET |
Datacenter |
BRI1 (Namex Bari) |
The planned activities will involve power distribution systems, power supply will be granted by continuity systems and generators |
No service downtime is expected |
COMPLETED |
Wed, Sep 6th 2023 |
12.00 PM (Noon) to 6.00 PM CEST |
Datacenter |
BRI1 (Namex Bari) |
The planned activities will involve power distribution systems, power supply will be granted by continuity systems and generators |
No service downtime is expected |
COMPLETED |
Tue, Aug 1st 2023 |
4.00 AM to 7.00 AM CEST |
Peering Platform |
ROM (Namex Roma) |
Software upgrade of NVIDIA/Cumulus platform nodes, Route Server address renumbering to /23 |
Connectivity on the peering platform will be partially disrupted according to nodes being currently upgraded, route servers might be temporarily unavailable as well during operations. |
COMPLETED |
Thu, Jul 6th 2023 |
8.00 AM to 5.00 PM CEST |
Datacenter |
ROM1 (Caesar/CINECA), all rooms |
Maintenance on power distribution systems |
Interruptions in the supply of electricity to all the single-powered devices connected to A-line. Therefore, we suggest that you make accurate checks on your equipment and possibly take the right countermeasures. No service downtime is expected on dual-powered devices (connected to both A and B power lines) |
COMPLETED |
Thu, Jul 5th 2023 |
2.00 PM to 5.00 PM CEST |
Datacenter |
ROM1 (Caesar/CINECA), all rooms |
Maintenance on power distribution systems |
The planned activities will involve transformers, UPS, and main switches. Power will be granted by generators, no service disruption is expected |
COMPLETED |