Date Time Infrastructure Site/Room Description Impact Status
Wed, May 15th 2024 8.30 AM to 02.00 PM CEST Datacenter ROM1 (Caesar/CINECA), all rooms Maintenance on power distribution systems Planned activities will involve transformers, UPS, and main switches. Power will be granted by generators, no service disruption is expected PENDING
Tue, Mar 5th 2024 10.00 AM to 01.00 PM CET Peering Platform BRI1 (Namex Bari) The planned activities will involve power distribution systems on nodes in the peering platform Connectivity on the peering platform may be partially disrupted and route servers might be temporarily unavailable as well during operations COMPLETED
Tue, Feb 13th 2024 9.00 AM to 02.00 PM CET Datacenter BRI1 (Namex Bari) The planned activities will involve power distribution systems, power supply will be granted by continuity systems and generators No service downtime is expected COMPLETED
Wed, Sep 6th 2023 12.00 PM (Noon) to 6.00 PM CEST Datacenter BRI1 (Namex Bari) The planned activities will involve power distribution systems, power supply will be granted by continuity systems and generators No service downtime is expected COMPLETED
Tue, Aug 1st 2023 4.00 AM to 7.00 AM CEST Peering Platform ROM (Namex Roma) Software upgrade of NVIDIA/Cumulus platform nodes, Route Server address renumbering to /23 Connectivity on the peering platform will be partially disrupted according to nodes being currently upgraded, route servers might be temporarily unavailable as well during operations. COMPLETED
Thu, Jul 6th 2023 8.00 AM to 5.00 PM CEST Datacenter ROM1 (Caesar/CINECA), all rooms Maintenance on power distribution systems Interruptions in the supply of electricity to all the single-powered devices connected to A-line. Therefore, we suggest that you make accurate checks on your equipment and possibly take the right countermeasures. No service downtime is expected on dual-powered devices (connected to both A and B power lines) COMPLETED
Thu, Jul 5th 2023 2.00 PM to 5.00 PM CEST Datacenter ROM1 (Caesar/CINECA), all rooms Maintenance on power distribution systems The planned activities will involve transformers, UPS, and main switches. Power will be granted by generators, no service disruption is expected COMPLETED